Matthias and I have checked the status of the Wah vehicles.
14 Eh. still have a Relativtag >12, this could be taken out or move.
The problem, however, is that the vehicles due to Minimum 1-2 months full production then moved to the rear and then we are no longer able to keep the contractual deadlines.
Therefore, we would recommend to leave the vehicle in production and should be further deteriorate the situation with Wah then to respond ad hoc.