Hello Hao Xin,In initial email Mr. Seemüller is asking for drawing of 的英文翻譯

Hello Hao Xin,In initial email Mr.

Hello Hao Xin,

In initial email Mr. Seemüller is asking for drawing of Q5NF RUCA to do the B-release. I answered that we can provide the drawing based on currently to us know raw part drawing from Jilin Kaiser. Furthermore we like to know the status of B-release on raw part drawing at Audi for this part.
 For your information, that we are going to provide drawing to Audi soon and are getting the B-release, if the raw part is also okay.

In last email from Mr. Roth, he is asking about the timing for test parts on Audi testing device (OTS parts). If I remember right, you mentioned in another email to him, that it will be in cw 25/2017. Is this still valid and to you have a confirmed actual timing for us available?


Wie DU weisst, Audi wird B-Freigabe zu Führungslenker Audi Q5 NF geben.

Auf solche Basis wird Shenyang OttoFuchs die Schmiederohteile in KW17-KW18/2017 liefern.

In KW24/2017 wird ZF-Fawer die ZSB Fuehrungslenke fertig hergestellt und danach beginnt die Prueufngen.

Meine Frage:
In solche Situation gibt es keine Dauerlaufahrzeuge.

Muessen solche ZSB Fuehrungslenker in die Dauerlauf (EWP/EVP) eingebaut?

3 Momaten CKD Absicherung fuer SOP muss gemacht werden, ich wird FAW-VW Beschaffung diese Info informieren.

Wenn alle Pruefstanderproungen und Funktionsprueufngen , ohne EWP/EVP, kann BMG auch erteilt werden?

Beste Gruessen aus Xiaodong!
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
Hello Hao Xin,.In initial email Mr. Lake Müller is asking for drawing of Q5NF RUCA to do the B release. I answered that we can provide the drawing based on currently to US know raw part drawing from Jilin Emperor. Furthermore we like to know the status of B-release on raw part drawing at Audi for this part. For your information, that we are going to provide drawing to Audi soon and are getting the B release, if the raw part is so okay. In last email from Mr. Roth, he is asking about the timing for test parts on Audi testing device (OTS parts). If I remember right, you mentioned in another email to him, that it wants to be in cw 25/2017. is this still valid and to you have a confirmed actual timing for US available?As YOU know, Audi will be B share to guide arm Audi Q5 NF.On such basis, Shenyang OttoFuchs will deliver the raw forgings KW17-KW18/2017.KW24/2017 ZF Fawer is produced in the Assembly Fuehrungslenke finished and then starts the Prueufngen.My question is:In such a situation, there is no permanent LAU vehicles.Must such Assembly guide bars into the endurance (ESP/EPP) installed? Protection for SOP must be made 3 Momaten CKD, FAW-VW will supply this info inform information.If all Pruefstanderproungen and Funktionsprueufngen without EPP/EWP, BMG also issued?Best regards from Xiaodong!
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
Hello Hao Xin,

in initial email Mr. Seemüller is asking for drawing of Q5NF RUCA to do the B-release. I answered did we can Provide the drawing based on currently to us know raw part drawing from Jilin Emperor. Further More we like to know the status of B-release on raw part drawing at Audi for this part.
 For your information, did we are going to Provide drawing to Audi soon and are getting the B-release, if the raw part is therefore okay.

In load emailfrom Mr. Roth, he is asking about the timing for test parts on Audi testing device (OTS parts). If I remember right, you Mentioned in another email to him, did it wants to be in cw 25/2017. Is this tranquil valid and to you have a confirmed actual timing for us available?


How YOU know, Audi will be B released to radius arm Audi Q5 NF.

On such a basis Shenyang Otto Fuchs will supply the Schmiederohteile in KW17-KW18 / 2017th

In KW24 / 2017 IF Fawer is finished the ZSB Fuehrungslenke prepared and thereafter the Prueufngen begins.

My question
in such a situation there is no Dauerlaufahrzeuge.

have incorporated such ZSB Fuehrungslenker in the endurance run (EWP / EPP)?

3 Momaten CKD hedging needs for SOP made be, I will inform this info FAW-VW procurement.

If all Pruefstanderproungen and Funktionsprueufngen without EWP / EPP, BMG can be granted?

Best Regards from Xiaodong!
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
hello, hao xinin the initial email mr. seemüller is asking for drawing of q5nf ruca to do the b release. i want that we can provide the drawing based on currently to us know raw part drawing from israel emperor. furthermore we like to know the status of b release on raw part drawing at audi for this part. for your information that we are going to provide drawing to audi soon and are getting the b release, if the raw part is also okay.in last email from mr. roth, he is asking about the timing for test parts on audi testing device (ots parts). if i remember right, you mentioned in another email to him, that it will be in cw 25 / 2017. is this still valid and you have a confirmed actual timing for us available?as you know, audi will release führungslenker audi q5 to b - nf.on such basis, is the shenyang ottofuchs schmiederohteile in kw17 - kw18 / 2017 deliver.in kw24 / 2017 will be the zsb zf fawer fuehrungslenke finished manufactured and then begins the prueufngen.my question is:in such situation, there is no dauerlaufahrzeuge.have such zsb fuehrungslenker in the endurance test (ewp / epp) installed?3 momaten ckd for sop cover has to be done, i will inform the faw vw procurement information.if all pruefstanderproungen and funktionsprueufngen without ewp / ppe), can also be given?best gruessen from xiaodong!
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: